NGH provided (2) redundant Mitsubishi 750kW UPS Systems with downstream PDI static switch, and (6) PDI 225kVA power distribution units. NGH also provided, installed and tested Alber battery monitoring. NGH provided a full turn-key solution with temperature controlled storage of the equipment, until the site was ready, delivery, rigging, and installation assistance. NGH completed the project by performing 48 hour load bank testing and burn-in, IEEE-1188 battery capacity testing and IR thermography.